Past 10yrs, Enage has a good reputation of manufacturing various webmail system, server load balancer, collaboration groupware and IP pbx solutions.
We are the leader of webmail system, IP centrex solution, communication groupware, groupware software, web based mail system, IP PBX and EDMS.
|
|
 |
| Home
>
Support
> Tech. informations
>
System requirements
|
 |
| |
|
|
| |
 |
| |
System operating environment |
|
| Server Specification |
Client Specification |
| OS |
Windows 2000 or 2003 Server 5clt
(2003 recommended) |
OS |
Window 95/98/ME/XP/2000/2003, MAC |
| DB |
MS-SQL 2000 or 2005 Server |
Web Browser |
Internet Explorer 5.5 ¡è (6.0 ¡è recommended) |
| Hard ware |
CPU : Intel Xeon 3.0GHz X 2
RAM : 2GB
HDD : 73GB x 146GB x 2
* H/W depends on No. of (registered) users, |
Hard ware |
CPU : Intel Celeron 800Mhz ¡è
RAM : 256 MB ¡è (512 MB ¡è recommended)
* Basically all PC that can be Internet-surfing can work |
|
| |
 |
| |
 |
Inspection of Preparation Requirements |
| To build Group Ware system, it is necessary to check if following items are prepared. |
|
| Item |
Contents |
Remark |
Operation
Server |
G-Ware operation-only server is necessary (check if it is
prepared)
- except, it is possible to review the use of an existing server
that has extra resources enough to operate G-Ware. |
Specifications of G-Ware operation server for 100
persons.
- more than 2CPU/1G RAM /36G HDD (more than
SATA level)
- details should be discussed. |
Operation
Software |
Check if following softwares are installed in the ¡®Operation Server¡®.
1. Windows 2000 or 2003 server standard Edtn 5clt
2. MS-SQL Server 2000 Standard Edtn (more than 5clt or 2 PL) |
If an ¡®operation software¡¯ is installed in G-Ware server,
it can be used.
- If there is an extra SQL2000 server, it can be used as
a DB server. |
Client
Environment |
It would be OK if more than internet explorer 5.5 version is installed and
used in users¡¯ PC. |
User PCs should be able to, at least, surf and search the
internet in the present browser. |
(Authorized)
IP |
An ¡®authorized and fixed IP¡¯ is necessary to have access to G-Ware server
from outside.
- The IP is necessary to use e-mail and have easy access to URL from in/outside. |
If broadband internet service is being used in the company,
the users need ¡®authorized and fixed IPs¡¯. |
| Domain |
Not only ¡®authorized IP¡¯ but also an officially-used domain are needed to
use ¡®E-mail address¡¯ provided by G-Ware solution. |
Customer¡¯s present homepage domain is available. |
| Access URL |
In order for users to have easy access to G-Ware site to be built, Access URL
should be created (use officially-used ¡®domain¡¯)
- In many cases, ¡®gw, intranet, group, etc.¡¯ are used in front of customer domains. |
It is necessary to create host or sub-domain in the above
domain
- This should be asked of DNS server manager, in charge
of ¡®company domain¡¯ |
| E-mail |
In order to use e-mail in G-Ware built by this company, change into a
stable mail server is needed according to ¡®strategy for e-mail transfer¡¯ |
For details, refer to ¡®Strategy for E-mail transfer¡¯
The users who already have other e-main address can be
targeted. |
Electronic
Approval |
It is necessary to make prior review for ¡®authorization discretion rule
(including approval line), numbering system for approval document, official
document form, and issue of document (form) registration, etc.¡¯ |
For more details, refer to ¡®check points for the introduction
of electronic approval system¡¯ on the back side of this
document. |
|
| |
 |
|
| |
|
|